Center West Water Treatment Plant 500KG EST Rehabilitation

Center West Water Treatment Plant 500KG EST Rehabilitation

Manchac Consulting Group, Inc. was retained by the City of Lake Charles, LA to provide engineering design, construction management, and resident inspection services for rehabilitation of an existing 500,000 gallon elevated finished water storage tank. Rehabilitation...
Chennault Water Treatment Plant 400KG EST Rehabilitation

Chennault Water Treatment Plant 400KG EST Rehabilitation

Manchac Consulting Group, Inc. was retained by the City of Lake Charles, LA to provide engineering design, construction management, and resident inspection services for rehabilitation of an existing 400,000 gallon elevated finished water storage tank. Rehabilitation...
42” Diameter Water Main

42” Diameter Water Main

The City of Bossier City hired Manchac to prepare a water distribution system model to identify problem areas in their distribution system. As a result, a project was identified to upsize some old 20” diameter mains to 42” diameter. The City’s WTP had recently been...
Southwest Water Treatment Plant GST #2

Southwest Water Treatment Plant GST #2

Manchac Consulting Group, Inc. was retained by the City of Lake Charles, LA to provide engineering design, construction management, and resident inspection services for the construction of a redundant 2.0 MG pre-stressed concrete finished water storage tank to replace...